The long-awaited Barapullah Phase III elevated corridor in Delhi is set to open on September 29, enhancing travel between key areas such as Mayur Vihar, East Delhi, Noida, and South Delhi. This infrastructure project promises to significantly cut down travel times and improve connectivity in the bustling city.
The 3.5-kilometer corridor links Mayur Vihar Phase I with Sarai Kale Khan and integrates with the existing Barapullah corridor, creating a largely signal-free route to South Delhi. This development is expected to reduce travel times from the current 35–40 minutes to approximately 15 minutes, contingent on traffic conditions and starting points.
Key features of the four-lane corridor include a bridge over the Yamuna River, nine traffic-distribution loops, connecting ramps, and provisions for cyclists and pedestrians. These enhancements aim to provide smoother and more efficient travel for commuters.
The project, initially approved in 2014, faced multiple delays due to issues such as land acquisition, regulatory clearances, construction challenges, and disruptions from the COVID-19 pandemic. These setbacks also led to an increase in the project cost, which has risen from an estimated ₹1,260 crore to around ₹1,635 crore.
As the opening date approaches, major components like the Yamuna bridge and connecting ramps have been completed, with final preparations underway. The new corridor is anticipated to play a crucial role in easing traffic congestion and providing a more efficient transport option for residents and visitors in Delhi.
